🏷️ Chisholm Summit | Phases I, II & III

Chisholm Summit is a large, three-phase residential development underway in Burleson, Texas, and our team is currently in the early stages of utility installation. Projects of this size take time to take shape, and it all starts below the surface with the infrastructure that will support the community for years to come.


👤 CLIENT

Undisclosed

📍 LOCATION

Burleson, Texas

🏗️ INDUSTRY

Residential

🛠️ SCOPE

Water, Sewer, Storm Drain

📋 DETAILS

𝗪𝗔𝗧𝗘𝗥

  • Installation of 4", 8", and 12" PVC C900 water lines (16,000+ LF total)

  • Gate valves, boxes, and fire hydrant assemblies

  • Water service connections and irrigation infrastructure

𝗦𝗘𝗪𝗘𝗥

  • Installation of 8" and 10" PVC sewer lines (SDR-35 & SDR-26, 15,000+ LF total)

  • Bored crossings with steel casing. 

𝗦𝗧𝗢𝗥𝗠

  • Installation of 5500’ reinforced concrete pipe (18"–48" RCP)

  • 1500’ Reinforced concrete box culverts (multiple sizes)

  • Curb inlets and headwalls. 