Hulen Trails

OVERVIEW

Our crews are hard at work in South Fort Worth installing water lines, sanitary sewer, and storm drain systems to support this expanding master-planned community. These essential underground utilities are the backbone of any successful development, ensuring future residents have access to clean water, reliable wastewater service, and flood-resilient infrastructure.

CLIENT

Undisclosed

LOCATION

Fort Worth, Texas

INDUSTRY

Residential

SCOPE

Water, Sewer, Storm Drain

DETAILS

WATER:

  • 8" water line lowering

  • 4800' of 8" PVC & 12" PVC & DIP water line

  • 6 fire hydrant assemblies

  • 144 1" water services (domestic)

  • 2 1" water services (irrigation)

  • 1 1/2" water service (irrigation)

  • 4 8" gate valves and valve boxes

  • 4 12" gate valves and valve boxes

  • 250' of 4" PVC irrigation sleeves

PUBLIC SEWER:

  • 5000' of 8" sewer line

  • 144 -4" sewer services

  • 21 4' manholes

  • 5' drop manhole

PUBLIC STORM:

  • 2950' of 21", 24", 27", 30", 42" RCP

  • 480' of 5x4 box culvert

  • 200' of 2-5x4 box culvert

  • 450' of 2-4x4 box culvert

  • 4 4' storm junction boxes

Next
Next

Paloma Trails