🏷️ Linda Griffin Elementary

Work is underway at Linda Griffin Elementary in Garland, where Venus Construction is installing a comprehensive package of public and private utility infrastructure to support the campus. The project includes water, sanitary sewer, fire line, storm drainage, pavement restoration, and landscape drainage improvements.


👤 CLIENT

Undisclosed

📍 LOCATION

Dallas, Texas

🏗️ INDUSTRY

Municipal

🛠️ SCOPE

Water, Sewer, Storm Drain, Fire Line

📋 DETAILS

Public Water

  • 8", 6", and 4" C-900 water lines

  • Cut-in connections to the existing 8" water line

  • Fire hydrant, gate valves, meter, and vault

  • Pavement removal and replacement

Public Sewer

  • 74 LF of 6" SDR-26 sewer line

  • Connection to the existing sanitary sewer manhole

  • Pavement restoration and traffic control

Off-Site Storm Drain

  • 684 LF of reinforced concrete box and storm pipe ranging from 18" to 36"

  • Precast curb inlet and cast-in-place junction boxes

  • Connections to existing storm infrastructure

  • Existing sewer encasement and storm drain demolition

Fire Line

  • 248 LF of 8" fire service

  • 178 LF of 6" FDC line

  • Fire risers and fire department connection

Private Water

  • 157 LF of 4" C-900 domestic water line

  • Ductile iron fittings, bends, and cap

Private Sewer

  • More than 1,160 LF of 4" and 6" SDR-26 sewer line

  • Six precast sanitary sewer manholes

  • Eight cleanouts

  • Associated wyes, reducers, bends, caps, and fittings

Private Storm Drain

  • More than 2,190 LF of reinforced concrete pipe ranging from 12" to 30"

  • Precast curb and grate inlets

Landscape & Roof Drainage

  • Nearly 2,200 LF of HDPE and PVC drainage pipe

  • 32 precast catch basins

  • Associated fittings, adapters, and connections