🏷️ Main Street Rehab | Keller
Main Street Rehab is an infrastructure improvement project underway in Keller, Texas, focused on upgrading aging utility systems and supporting the continued reliability of the area's underground infrastructure. Projects like this require careful coordination to replace and improve critical utilities while minimizing disruption to the surrounding community.
👤 CLIENT
Undisclosed
📍 LOCATION
Keller, Texas
🏗️ INDUSTRY
Residential
🛠️ SCOPE
Water, Sewer, Storm Drain
📋 DETAILS
𝗪𝗔𝗧𝗘𝗥
Installation of 1,600+ LF of 8" PVC water line
Gate valves, fire hydrant assemblies, and water services
Steel-bored casing installation
Water main tie-ins to existing systems
𝗦𝗘𝗪𝗘𝗥
Installation of 2,000+ LF of 8" SDR-26 PVC sewer main
Sanitary sewer manholes and service connections
Sewer service extensions to existing homes
Connections to existing sewer infrastructure
Abandonment and replacement of existing sewer facilities
Post-construction CCTV inspection and testing
𝗦𝗧𝗢𝗥𝗠
Installation of 24" HDPE storm drain
Drop structure and curb inlet installation
Storm system tie-in to existing infrastructure
Safety end treatment
Concrete flume improvements