🏷️ Myrtle Creek | Wa

Infrastructure like this doesn’t always make headlines—but it’s what keeps systems moving. A major component of this work involves pipe boring, allowing critical lines to be installed beneath existing surfaces with precision and minimal disruption. Trenchless operations require alignment, depth control, and experienced crews to execute properly.


👤 CLIENT

Undisclosed

📍 LOCATION

Waxahachie, Texas

🏗️ INDUSTRY

Residential

🛠️ SCOPE

Electrical, Pipe Boring

📋 DETAILS

  • Wet well installation

  • Vertical turbine pump station

  • 4”, 6”, and 8” HDPE SDR11 piping

  • AVK valves and 2” discharge piping

  • Pond level control valve assembly

  • Pipe bore and/or sleeve crossings

  • Electrical from transformer to distribution

  • Pad site preparation and gravel placement

Previous
Previous

Linda Griffin Elementary

Next
Next

Balcones Ranch | Cedar Hill