🏷️ Miller Road & 635

The Miller 635 Industrial project in Dallas is well underway, with our crews supporting the installation of extensive underground utility infrastructure for this major industrial development. From public utilities to private site infrastructure, this project showcases the coordination and expertise required to keep large-scale developments moving forward.


👤 CLIENT

Undisclosed

📍 LOCATION

Dallas, Texas

🏗️ INDUSTRY

Industrial

🛠️ SCOPE

Water, Sewer, Storm Drain, Fire Line

📋 DETAILS

𝗣𝗨𝗕𝗟𝗜𝗖 𝗪𝗔𝗧𝗘𝗥

  • 12" and 8" C-900 water main installation

  • Fire hydrants and hydrants with bollards

  • Gate valves and ductile iron fittings

  • Meter vault and irrigation services

  • Multiple tie-ins to existing water infrastructure

  • Existing hydrant and meter relocations

𝗣𝗨𝗕𝗟𝗜𝗖 𝗦𝗘𝗪𝗘𝗥

  • 8" sanitary sewer main installation

  • 6" sewer laterals

  • New sanitary sewer manholes

  • Cleanouts and system tie-ins

  • Existing sewer abandonment and plug/cap work

𝗣𝗨𝗕𝗟𝗜𝗖 𝗦𝗧𝗢𝗥𝗠 𝗗𝗥𝗔𝗜𝗡

  • 96", 48", 36", 24", and 21" storm drainage systems

  • CMP and reinforced concrete pipe installation

  • Curb inlets, grate inlets, and catch basins

  • Storm drain tie-ins and wye connections

  • Demolition and replacement of existing storm structures

𝗙𝗜𝗥𝗘 𝗟𝗜𝗡𝗘

  • 10" fire line installation

  • Fire line vault and fire riser

  • Ductile iron fittings and associated appurtenances

𝗣𝗥𝗜𝗩𝗔𝗧𝗘 𝗪𝗔𝗧𝗘𝗥

  • Building water service installation

  • Ductile iron fittings

𝗣𝗥𝗜𝗩𝗔𝗧𝗘 𝗦𝗘𝗪𝗘𝗥

  • vBuilding sewer service installation

  • Steel casing and spacers

  • Cleanouts

𝗣𝗥𝗜𝗩𝗔𝗧𝗘 𝗦𝗧𝗢𝗥𝗠 𝗗𝗥𝗔𝗜𝗡

  • 48", 42", 36", 30", 24", 18", and 12" storm drainage systems

  • Heavy-duty trench drain

  • Junction boxes

  • Curb and grate inlets

Previous
Previous

Main Street Rehab | Keller

Next
Next

Chisholm Summit | Phases I, II & III